Two people, one sheet.

The checker works in the document, on the line in question. The query, the answer and the signature all end up in the same file as the calculation.

Sheaf MER-CALC-014 · Meridian Engineering RT MK
N≔820kN
B≔2.4m
L≔2.4m
σallow≔150kPa MK
A≔B·L=5.760m²
σ≔ N A =142.361kPa
η= σ σallow =0.949 0.949 ✓
PreparedR. Tan · 8 Aug 2026 Checked{{ checked }}
MK M. Kaur 12:43
{{ cmtText }}
σallow · line 4
RT R. Tan 12:44
Site investigation report 2418-GI, table 4. Reference added to the note.
✓ Resolved by M. Kaur · 12:44